Beyhan II Dam

Dam in Palu, Elazığ Province
38°42′26.2″N 039°59′12.8″E / 38.707278°N 39.986889°E / 38.707278; 39.986889PurposePowerStatusPlannedOwner(s)Kalehan Energy GenerationDam and spillwaysType of damGravityImpoundsMurat RiverHeight (foundation)62 m (203 ft)Height (thalweg)41.8 m (137 ft)Length364 m (1,194 ft)Dam volume232,000 m3 (303,000 cu yd)Spillway capacity10,528 m3/s (371,800 cu ft/s)ReservoirTotal capacity78,920,000 m3 (63,980 acre⋅ft)TypeConventionalHydraulic head35 m (115 ft) (gross)Installed capacity264 MWAnnual generation585 GWh (est.)

The Beyhan II Dam is a planned[1][2] gravity dam on the Murat River near the village of Beyhan in Palu district, Elazığ Province, Turkey. The primary purpose of the 62 m (203 ft) tall dam is power and it supports a 264 MW hydroelectric power station. It is owned by Kalehan Energy Generation.[3]

See also

  • Beyhan I Dam – upstream

References

  1. ^ "Pöyry to work on Turkey's Beyhan II Dam - International Water Power". www.waterpowermagazine.com. Retrieved 2022-11-22.
  2. ^ "Barajlarda hibrit devri". Türkiye Gazetesi (in Turkish). 24 May 2022. Retrieved 2022-11-22.
  3. ^ "Beyhan 2 Dam and HEPP". Kalehan Enerji Grubu. Retrieved 2022-11-22.
  • v
  • t
  • e
Aegean
Region
Black Sea
RegionCentral
Anatolia
RegionEastern
Anatolia
RegionMarmara
RegionMediterranean
RegionSoutheastern
Anatolia
Region
  • Dams by province
  • Hydroelectric power stations